A selection of recent projects from across our patch — cable pulling, jointing, spiking, trenching, ducting and EV charger installation work for DNOs, ICPs, main contractors and developers.
Three drum lengths of 33kV triplex through a live industrial estate, pulled and jointed inside a four-day shutdown window.
Eight 150kW rapid chargers brought live across a working forecourt without closing it for a single day.
Six end-of-life cables proved dead and cut safely as part of a substation switch-out programme on a live N. London estate.
Forty-seven LV service cables pulled into a new-build estate, sequenced around the bricklayers and ahead of the road build.
An 11kV ring main diverted out from under a redevelopment plot in a Section 58 town centre — without closing the high street.
Twelve 400kW ultra-rapid chargers wired into a working last-mile delivery depot — including a new HV supply from the DNO.
Eight hundred metres of co-ordinated trench installation for electric, gas, water and telecoms — single trench, single contractor.
An 11kV joint built and tested in the dark and the wet, to get a Hertfordshire village back on supply after a storm-felled tree took out the overhead.
Three hundred and twenty square metres of permanent HAUC-compliant carriageway reinstatement after an LV network upgrade in Brent Cross.
A 12-way duct bank installed through the heart of Welwyn Garden City — laid to take everything a town centre redevelopment could throw at it for the next 25 years.
Fourteen separate spikes delivered across two weeks for a DNO framework client, covering a rolling LV network refresh in Cheshunt.
A neat 7kW driveway charger install for a private customer in Chelmsford — block-paved driveway opened, ducted and re-laid in two days.
Four 11kV cables proved dead and the old switchgear cleared, ten minutes from our yard in Letchworth.
An 11kV supply pulled into a new research facility on a Cambridge science park, with terminations into both a packaged substation and a new MV switchroom.
LV power distribution installed around a forty-dock distribution centre in Bedford — racking, jointing and energising in time for tenant move-in.
1.2 kilometres of combined utility trench laid through a new commercial park in Milton Keynes — one trench, four services, one programme.
Backup-power 11kV cable upgrade between a Luton hospital's main intake and its standby generator hall — installed and commissioned during planned outage windows.
A complete LV cable refresh across a twelve-unit industrial estate in our home town of Letchworth — without interrupting trading hours for a single tenant.
Roadworks struck a buried LV cable on a Northampton residential estate — eighty homes off supply. On site in 90 minutes, joint built and live by tea time.
Four 33kV circuits re-pulled and re-jointed as part of a primary substation refurbishment on the edge of Peterborough.
An LV cable diversion through an Oxford conservation area, with original Yorkstone paving lifted, retained and re-laid to within millimetres of where it came from.
Sixteen EV chargers — eight rapid, eight fast — installed across a corporate tech park in Reading, with a phased HV supply upgrade.
Twelve EV chargers installed across a Norfolk holiday park — six lodge-side units and a central rapid bay — open through peak season.
11kV supply cables pulled and jointed for two new electric container-handling cranes at the Port of Ipswich.
An LV network refresh across nine Colchester town-centre streets — cables, joints and pillars replaced street-by-street with zero supply interruption.
A 22-spike framework programme across Birmingham over three weeks — HV cable isolations supporting a phased network refurbishment.
11kV shore-power cable installed to a Southampton cruise berth — letting visiting ships shut down their diesel auxiliaries while alongside.